Florian Ocenasek

Practicing Transformation

A workspace built at full scale from rammed earth, clay and straw.

Year

2026

Studio

Act of Building, Act III, "Practicing Transformation" · TU Wien

With

BC architects & studies & materials

Team

Natenael Eshaw Abebe, Lena Erk, Ema Hocevar, Clemens Langeder, Daniil Makhmudov, Florian Ocenasek, Miriam Semler, Ana Sovic

Built in

Reallabor, Kleine TVFA-Halle, Gusshausstraße 28, Vienna

Supervision

Thomas Amann

The second half of the semester left the drawings behind and built something to be sat in rather than rendered. The site was three strips in the hall, each 2.66 metres wide, 80 centimetres deep and 3.15 metres high. One group built a kitchen, one a place to read and rest, and ours in the middle a place to work and meet. The bench is rammed earth, the base rammed on site into formwork we built for it and the seat modules prefabricated, rammed rough, ground to their final form and oiled with linseed oil. The movable furniture stacks into itself and disappears completely into the bench. Overhead, curved panels of Japanese knotweed and loam carry the built-in lighting, and a mounted beamer projects onto the wall opposite, with the light switch and the HDMI routing integrated into the build. The wall behind is plastered in clay, sand and brick dust, and the chairs and the table are made from the formwork timber that had just come off the bench.

A workspace built at full scale from rammed earth, clay and straw.
In use, with the beamer on the rack above
The bench, counter and shelving seen along the wall
The table and stools, pulled out of the bench
The eight-person team seated along the bench
The team who built it

All photographs by Paul Sebesta.