Florian Ocenasek

Top 14

A Viennese flat stripped back and rebuilt, from the plan to the last fitting.

Year

2026

Role

planning and site coordination

Scope

full renovation of an Altbau flat

Result

completed and let, 2026

A 45 m² flat in a Gründerzeit building in the 16th district, where the old layout had the kitchen and the bathroom in the same room. It was stripped back and rebuilt on a new plan. The kitchen now doubles as the walkway through the flat, the bathroom and the bedroom only became possible once the walls moved, and a wardrobe was built into the bedroom niche. Everything behind the surfaces is new as well, all of the plumbing and all of the wiring, and the old boiler and sheet-steel stove gave way to the building's central heating. Built February to July 2026, and the tenant moved in on the first of August.

A Viennese flat stripped back and rebuilt, from the plan to the last fitting.
The kitchen, which is also the way through the flat
Floor plan of the flat after the renovation
Plan
The bathroom stripped back to brick during the works
Stripped back
Floor and ceiling opened up during demolition
Mid-demolition
Finished room with restored floor and window
Finished
Finished room with two windows to the street
Street side
The new bathroom
Bathroom